For builders and contractors
Smart home pre-wiring, before the walls close.
We work with builders, contractors and architects in Central Luzon to plan the wiring and network a smart home needs, then install it after you finish.
Talk about a projectWhat you get
A smart home option your buyers will ask about.
A pre-wiring plan per house type
We mark up your plans or a site visit with switch positions, network points, camera cable runs and power spots, so your crew knows exactly what to rough in.
Fewer callbacks after turnover
Neutral wires at the switches, conduit where cameras go and a LAN point in the right rooms mean the smart devices go in cleanly and your client does not call you about it.
Install and handover
After finishing, we install and set up the devices and show the homeowner how everything works. You hand over a house that works on day one.
One point of contact
One team plans, installs and supports it. You do not chase three suppliers or explain the plan to the homeowner a second time.
The pre-wiring checklist
Six things to rough in while the walls are open.
- 01
Neutral wire at every switch box
Many smart switches need a neutral wire. Pulling it now costs almost nothing. Adding it later means opening walls.
- 02
Conduit to the gate and the carport
A spare conduit to the gate, carport and garden allows a doorbell, cameras and outdoor lights without surface cables.
- 03
LAN points where WiFi is weakest
A cable to the living room, the upstairs hall and the outside corners lets us hang mesh nodes and cameras on a wired network.
- 04
A clean spot for the network gear
A small shelf with a power outlet, ventilation and an entry for the provider's fiber. It keeps the router and hub tidy.
- 05
Power at curtain tracks and the TV wall
Motorized curtains and a wall mounted TV need an outlet in the right place. It is easy to plan and awkward to retrofit.
- 06
Water tank and pump location
A dry spot with power and WiFi reach near the pump and tank allows scheduled filling, leak sensors and a controller.
This is a starting list. The right wiring depends on the house type and the devices, so we confirm it against your plan.
How we work together
Four steps, one handover.
- 01
Send the plan or invite us to the site
A floor plan, a house type or a walk through of a unit that is still open is enough to start.
- 02
We send a pre-wiring plan
You get a marked-up plan and a short list for your electrician: what to run, where and how many.
- 03
Your crew roughs it in
Your electrician does the wiring as part of the build. We answer questions and can visit before the walls close.
- 04
We install and hand over
When the house is finished, we install the devices, set up the network and show the homeowner how it works.
Builder questions
Quick answers.
Building in Central Luzon? Let us plan the smart part.
Send a floor plan or the project location. We reply with a short pre-wiring plan and what it involves, before anything is agreed.